
The first element of the Fehmarn Belt Tunnel between Germany and Denmark could be lowered off the Danish island of Lolland as early as this spring, Danish state-owned construction company Sund & Bælt said on Thursday.
A special vessel that is to sink the tunnel elements has been approved by the Danish Maritime Authority, the company said.
The ship's task was "complex, so numerous tests were necessary," deputy contract director Lasse Vester said in the statement. "Now we have received approval for the ship and can start lowering it."
The construction consortium Femern Link Contractors (FLC) can now begin the necessary preparations, it said.
In January, Sund & Bælt said the opening of the 18-kilometre tunnel was likely to be delayed until 2031, partly because of missing permits. Once the first tunnel elements have been sunk, a new timetable will be drawn up, it had now said.
Huge infrastructure project
According to Sund & Bælt, the Fehmarnbelt Tunnel for cars and trains is one of Europe's largest infrastructure projects. It will eventually connect the German island of Fehmarn with the Danish island of Lolland.
On the German side, a hinterland connection is being built that also includes the Fehmarn Sound Tunnel between the island and the German mainland.
'Stranger Things' series finale trailer shows Hawkins gang gearing up for last battle with Vecna
KJ Apa stars as Jimmy Stewart in new biopic: See his transformation
Journey through Pages: A Survey of \Plunging into Scholarly Universes\
South Carolina measles outbreak grows by nearly 100, spreads to North Carolina and Ohio
UN panel says Israel operating 'de facto policy of torture'
From Dread to Certainty: Individual Accounts of Strengthening
Outer space conditions hamper sperm's ability to navigate toward an egg
People with depression can treat themselves at home with new device
SpaceX shatters its rocket launch record yet again — 165 orbital flights in 2025












